Project Overview
Initial platform of this Four Staged Project included, demolishing an existing building and filling two large existing damns. Our Storm Water crew installed 700 metres of Storm Water and constructed a bio basin to ensure the contaminants and sedimentation was environmentally friendly for the Storm Water run-off.
Three new separate Car Parks were constructed consisting of 262 new Car Parks for the school, an overflow Car Park and internal road were also constructed as well as an extra entrance to the School with extravagant entry gates. The existing roundabout inside the School was also redeveloped to create a more effective system for Parents to flow in and out of the newly constructed Roads and Car Parks.