Project Details
Project Overview
MBRCÂ awarded this project to Universal Civil Contracting at the beginning of 2017 and construction of Leitchs Crossing Rock Ramp Fishway was completed in May 2017.
The fishway was constructed on the downstream side of a pedestrian causeway in Brendale consisting of twelve 450 mm diameter pipes and a ~250 mm water surface drop off the downstream culvert apron.
The project was completed 3 weeks ahead of schedule.